29/4/2019  –  Roof Repair, Silver Street

Following some comments made about the temporary emergency safety netting on Silver Street, the Estate would like to make the following statement:

The rear elevation of the properties in Silver Street are having repairs carried out, and as a health & safety measure, due to forecasted high winds, temporary netting was put in place to catch any tiles coming loose and falling last weekend. Following consultation with an Ecologist this netting is now in the process of being changed to a more robust wish mesh. The remainder of the roof repairs are estimated to take no more than 2 weeks when the guards will be removed.

The Estate thanks you for your understanding and hopes this clarifies the situation.

 

Featured Estate Property